Construction of the Gemikonağı Reservoir, the largest reservoir in the TRNC, began in 1989 and was completed in 1992.
With a capacity of 4,000,000 tonnes of water, the Gemikonağı Reservoir meets the water needs of the Lefke region.
Construction of the Gemikonağı Reservoir, the largest reservoir in the TRNC, began in 1989 and was completed in 1992.
With a capacity of 4,000,000 tonnes of water, the Gemikonağı Reservoir meets the water needs of the Lefke region.
Green Lefke; tranquillity is in its nature!
Lefke Municipality © 2026. All rights reserved.
Web Design & Development: Saiber.ai